Construction Phase
Construction Phase
|
Date: 02/18/2007
Owner: John Nay
Size: 33 items
(926 items total)
|
|
Album: Unloading the Matson Container
We shipped our "stuff" via the Matson Shipping line and it arrived sooner than expected.
Date: 02/18/2007
Owner: John Nay
Size: 9 items
(10 items total)
Views: 788
|
Album: Tent City
Located on the upper pad, above the Lodge.
Date: 02/18/2007
Owner: John Nay
Size: 16 items
Views: 1501
|
Album: Pad Creation
Dennis Andrade and company cutting/dozing the pad are the first construction pictures.
Date: 02/19/2007
Owner: John Nay
Size: 54 items
Views: 3898
|
|
Album: Layout of the Structure
Followed by the layout of the structure.
Date: 02/20/2007
Owner: John Nay
Size: 7 items
Views: 677
|
Album: Septic Installation
Dennis Andrade returns to dig and install the septic system.
Date: 02/20/2007
Owner: John Nay
Size: 150 items
Views: 9516
|
Album: Creating the Emu Pit
Date: 02/25/2007
Owner: John Nay
Size: 21 items
Views: 2197
|
|
Album: Building the Structure
Building is an on-going project, we are finished waiting our turn to have our forms inspected and so we have poured cement.
Date: 02/25/2007
Owner: John Nay
Size: 35 items
(348 items total)
Views: 5001
|
Album: Finishing the Inside
Date: 03/03/2007
Owner: John Nay
Size: 26 items
(277 items total)
Views: 4805
|
Album: The Stone Wall Construction
This wall is located above the Lodge, on the second acre where the family house will be.
Date: 02/25/2007
Owner: John Nay
Size: 10 items
Views: 897
|
|
|